Customization: | Available |
---|---|
After-sales Service: | Lifetime Technical Services |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Main Characteristics And Scope of Application
System name | Serial Number | System equipment name | Unit | Number |
Pretreatment System | 1 | Temporary storage Pool | Set | 1 |
2 | Elevators, Eonveyors,shredders | Set | 1 | |
Thermal Pyrolysis System |
1 | Pyrolysis furnace Combustion chamber temperature 850-1100 ºC Refractory lining |
Seat | 1 |
2 | Two ignition and combustion assisting combustion engines are installed in the first and second combustion chambers respectively to ensure sufficient pyrolysis and combustion inside the chamber | Set | 2 | |
3 | Secondary Combustion Chamber | Seat | 1 | |
4 | Slag Remover | Set | 1 | |
5 | Temperature Measuring Element | Set | ||
6 | Furnace Manhole Door | Set | 1 | |
7 | air blower | Set | 1 | |
Smoke And Air System | 1 | Tubular Air Preheater | Set | 1 |
2 | Primary Air Fan | Set | 1 | |
3 | Primary Air Disc Valve | Piece | 1 | |
4 | Induced Draft Fan (Frequency Modulation) | Set | 1 | |
5 | Chimney Breast | Set | 1 | |
Flue Gas Treatment And Purification System | 1 | Spray device Sodium hydroxide or calcium hydroxide liquid, absorbs acidic gases from exhaust gas (desulfurization) |
Set | 1 |
2 | Activated carbon adsorption tower Material bed, air distribution board, air cap, absorb dioxins and harmful gases |
Unit | 1 | |
3 | Bag filter Fumes coated dust bag (temperature resistance: 160 degrees) |
Set | 1 | |
4 | Bag filter bypass disc valve | Unit | 1 | |
5 | Imported disc valve for bag filter | Unit | 1 | |
6 | Bag filter outlet disc valve | Unit | 1 | |
Electric Control And Thermal Power Instruments | 1 | Automatic Control | Unit | 1 |
2 | temperature Control | Set | 1 | |
3 | Spare Parts | Piece | ||
4 | Other spare Parts And Pipelines | Piece |
Daily processing capacity | 3-5 tons | |
Incoming materials | Medical waste | |
Auxiliary fuel | Diesel or natural gas | |
Annual processing capacity | ≥ 1500 tons | |
Annual operating time | ≥ 7000 hours | |
Secondary combustion chamber Emissions of "three wastes" |
temperature | ≥8500C |
Smoke retention time | ≥2s | |
Secondary combustion chamber | waste gas | Compliant with the limit values of the Pollution Control Standards for Garbage Incineration (GB18485-2014) |
Waste residue | Can be used for paving, brick making, or landfilling | |
waste water | Garbage leachate is incinerated without producing any wastewater during production | |
Garbage reduction rate | ≥95% | |
Venue (m2) | Equipment footprint | 100m2 |
Factory area | 200m2 | |
Land occupation of garbage treatment plant | 400m2 |